Intercontinental Jet Service Corp

Authorized Mitsubishi Service Center

  • Home
    • What do we do?
    • For Sale
    • Follow Us
    • Visiting Tulsa
    • Travelok.com
  • Services
    • Engine/Agricultural
    • Propeller Shop
      • Current Propeller Inventory
      • Exchange Propellers Available
      • STC Program
        • Hartzell Top Prop
        • McCauley Black Mac
    • Parts
    • Avionics
    • Airframe
    • Accessory Overhaul
      • Capabilities
  • Engines
  • For Sale
  • News
    • Customer Spotlight
    • Media
    • Press
      • IJSC Presents MU-2 Limited Edition™ – Press Release
      • MU-2 Limited Edition™ Project Update
      • MU-2 Improvements
      • IJSC Introduces MU-2 Sagem ICDS – Press Release
      • Sagem Integrated Cockpit Display Systems Updates
      • Garmin 600 Install
  • Tech Tips
  • Links
    • Customer Resources
  • Jobs
  • Contact
    • Privacy Policy

Honeywell Service Bulletins

LE024sm
Honeywell has recently issued a few service bulletins of interest for MU2 owners and operators. The first one to note is Service Bulletin TPE331-72-2208. This is a Category 2 service bulletin which addresses a substantial improvement to reliability. 72-2208 applies to all second stage compressor impellers P/N 893482-1 through -5 and 3107056-1,-2 so it will likely affect all MU2 engines currently being operated.

This service bulletin installs a new impeller P/N 3108387-1 or 3107167-1 with better design qualities to prevent possible cracking at the curvic tooth area. Removed impellers that are inspected by Honeywell and found to be serviceable may undergo a rework and re-identification process and be re-installed with an imposed cycle limit established for the part.

Current pricing for the new part is $12,067.00 and there is no program pricing or MSP coverage at this time. Honeywell recommends compliance with 72-2208 at next access to the 2nd impeller, but no later than next overhaul or CAM compressor inspection.

The second service bulletin consists of three separate bulletins addressing different engine models and pertains to the Combustion Chamber Assembly or Plenum as many people know it. All three service bulletins are Category 1 service bulletins which addresses a safety issue.

Service Bulletin TPE331-72-2218 applies to all 331-10 models currently installed on MU2 aircraft, TPE331-72-2233 applies to 331-1 engines for the “F” and “G” model operators and TPE331-72-2234 covers the 331-5/-6 engines for the various MU2 models utilizing these particular engines.

All of these service bulletins address installing a more robust Combustion Chamber P/N 70100072-X which is not prone to fatigue cracking at the weld joints. Currently the cost of the new plenum is $17,635.00 and there is no program pricing, however MSP coverage applies.

Honeywell recommends that these service bulletins be accomplished at the next Combustion Chamber removal from the engine, but no later than next Hot Section Inspection.

Intercontinental Jet Service Corp proudly sponsors:

No Plane No Gain - Business Aviation Means Economic Opportunity
FAA
Repair Station #
IZ2R916K
ANAC
Maintenance Organization Certificate
No. 9909-01/ANAC 
EASA
Part -145 Approval Certificate #
EASA.145-6569
  • Home
  • Services
  • Parts
  • Tech Tips
  • Links
  • IJSC Spotlight
  • Customer Resources
  • Contact Us

Intercontinental Jet Service Corp. is a Mitsubishi Authorized Service Center for MU2 Aircraft,
Honeywell TPE331 Authorized Service Center, Piaggio Aero Authorized Service Center, TPE331 Service Center


Copyright © 2026 Intercontinental Jet Service Corp. All rights reserved. · Log in · Designed by Pixel Dust, LLC